CHUNGDAM MOKHWA RIVERVILLE RENOVATION
LOCATION:
chungdam-dong, gangnam-gu, seoul, korea
AREA:
3036 sq.m
CHRONOLOGY:
design period: 2015.03 - 05
construction period: 2015.04 - 07
KEY MATERIALS:
tile filler paste, stone-look acrylic paint, kempas hardwood decking, white pebbles, stainless steel mesh gabion, glass blocks
CONSTRUCTION PROCESS - RESURFACING OVER EXISTING TILES
CONSTRUCTION PROCESS - EXTERIOR SCAFFOLDING SHEATHING THEN REVEALING
CONSTRUCTION PROCESS - THE PERIMETER WALL AND GABION LAMP POSTS
BUILDING FACADE - BEFORE AND AFTER
3D STUDY - COLOR SCHEME ELEVATIONS
MATERIAL PALETTE
(from left to right)
1. Four shades of stone-look acrylic paint
2. Glass blocks
3. Kempas hardwood decking
4. White pebbles
TILE-FILLING PROCESS MOCK-UP
(from right to left)
1. Tile-filler paste (base) over existing tile
2. Nylon mesh
3. Tile filler paste (finish)
4. Embossing basecoat
5. Stone-look acrylic paint
6. Clear coat