S.M.K. DONKATSU DINER
LOCATION:
dukpoong-dong, hanam-shi, kyunggi-do, korea
AREA:
57.35 sq.m
CHRONOLOGY:
design period: 2013.02
construction period: 2013.03
KEY MATERIALS:
clear epoxy resin over exposed concrete, wallpaper, chalkboard paint, paint over drywall
CONSTRUCTION PROCESS
3D STUDY
MATERIAL PALETTE
(from left to right)
1. Synthetic grass
2. Clear epoxy resin over cement
3. Chalkboard
4. Oriented strand board