HAUTE NAILS

LOCATION:
shinsa-dong, gangnam-gu, seoul, korea

AREA:
37 sq.m

CHRONOLOGY:
design period: 2015.05
construction period: 2015.05 - 06

KEY MATERIALS:
engineered teak board, synthetic grass, gold plated steel, paint over concrete, clear epoxy resin over concrete floor


CONSTRUCTION PROCESS

FLOORPLAN

MATERIAL PALETTE
(from left to right)

1. Synthetic grass
2. Clear epoxy resin over cement
3. Gold / Gray paint
4. Engineered teak planks